E-Mobility / Technical Interpreting

HV battery manufacturing: interpreting at Accumotive

Verified Last verified: 2026-09-12
Coordinating linguistic support at the Accumotive GmbH & Co. KG plant in Kamenz. The project involved interpreting during the assembly of High Voltage (HV) battery systems for Mercedes-EQ models, executed under strict health and safety protocols (Red/Blue team separation) at the height of the COVID-19 pandemic.
Project Parameters (Evidence Bank)
Kamenz (Saxony)Location
HV Batteries (Li-Ion)Product
Strict health protocols (COVID-19)Operating conditions
400V / Cell modulesTechnology

Bolt Key Takeaways

  • E-mobility pivot: Transitioning from classical ICE engine terminology to advanced electronics and electrolyte chemistry.
  • HSE & High Voltage: Working in high-voltage environments requiring dedicated safety clearances and ESD protective gear.
  • Crisis management: Managing an interpreting team under total isolation protocols (Red/Blue teams) without disrupting training continuity.
  • Technology: In-depth understanding of 'wedding' processes (joining cells into modules) and thermal management systems.
  • Pandemic logistics: Navigating daily operations during lockdowns, closed borders, and ubiquitous health measures.

Electric revolution in the shadow of the pandemic

The end of 2020 posed a severe test for the entire industrial sector. At the height of the second wave of the COVID-19 pandemic, my interpreting team and I were deployed to Kamenz, Saxony — the heart of the electric transformation for Stuttgart’s automotive giant. The Accumotive GmbH & Co. KG plant produces battery packs for electrified Mercedes-Benz vehicles.


The challenge was twofold. First, the technical scope: interpreters had to shift instantly from internal combustion terminology to E-Mobility concepts. Instead of fuel injectors and turbochargers, discussions centered on cell modules, busbars, thermal interface materials, and Battery Management System (BMS) controls.

Red and Blue: the logistics of isolation

Second, operating conditions: to prevent a single outbreak from halting production, the plant implemented a strict division into Red and Blue teams. These groups had zero physical contact — crossing paths only through airlocks and using separate entrances and locker rooms. As coordinator, I managed interpreter schedules to guarantee uninterrupted linguistic support while strictly maintaining team isolation. Furthermore, every shift began with automated temperature checks at plant security and ended with the disinfection of TourGuide audio equipment.

High Voltage: interpreting under pressure

Working at Accumotive demanded a safety culture fundamentally different from traditional assembly plants. We entered High Voltage (HV) zones where battery pack voltages reached up to 400V. Interpreters needed to master not only technical vocabulary but also strict HSE safety protocols.


Antistatic gowns, specialized footwear, and strict adherence to high-voltage safety rules were mandatory. We interpreted assembly processes for combining cell modules into battery packs, helium leak testing procedures, and HMI control operations.


Every project leaves lasting memories. Notable takeaways and anecdotes from this assignment include:

Despite challenging circumstances — lockdowns, closed restaurants, and deserted Dresden streets — this project offered a fascinating window into the future of mobility. Steaks enjoyed in quiet corners of an empty city center became our small ritual for maintaining normalcy during unprecedented times.

Verified references

Read Also

Thumbnail
Technical Translations / Automotive

Paint Shop Employee Qualification: Training Project in Germany

Thumbnail
Technical Interpreting / Coordination

Interpreter Coordination: Mercedes-Benz Engine Plant

Thumbnail
Technical Translation / Industry 4.0

Leading drive systems manufacturer: SEW-EURODRIVE

Need support
with a similar project?

Contact Me
Call