Permit to Work walkthrough
We go through each condition of the work permit with the executing team in their language before they enter the work area.
Result Shift lead has confirmation that the rules were understood, not only initialled.
Interpreting for TAR and safety instruction
On a planned turnaround (TAR) or at a machine safety instruction, every misunderstanding costs time or safety. We provide DE–PL interpreters on site — consecutive interpreting at the installation, during Permit to Work and LOTO walkthroughs, and at the workplace briefing — so shift and HSE leads know the crew actually understood the rules, not only signed them.
We go through each condition of the work permit with the executing team in their language before they enter the work area.
Result Shift lead has confirmation that the rules were understood, not only initialled.
We interpret lockout/tagout and clearance steps so it is clear who isolates, who verifies and who gives the final release.
Result Responsibilities are clear on both language sides — not assumed.
We interpret the safety instruction at the workplace and stay for the first practical steps, beyond classroom theory.
Result The briefing ends with correct first actions, not only a signature on the attendance list.
Direct consecutive interpreting between shutdown / shift lead, HSE and the crew — on the plant, not by phone from an office.
Result Decisions are taken in the shift they belong to, without waiting for the next day.
The job is not a quiet meeting room. We work in the shop hall and on scaffolding — under noise, in full PPE, in Ex/ATEX and other critical zones. Interpreting happens where the work happens, aligned with the shift pattern and the operator’s site rules. We do not run the safety training ourselves and we do not replace HSE — we close the language gap so existing procedures are understood.
You name the site, the time window and the type of work (TAR / turnaround, safety instruction, or both).
Language direction, on-site contacts, shift model, PPE and access rules of the operator.
Consecutive interpreting and shadowing where permits are discussed, briefings run and work is executed.
Short debrief: open points and recurring terminology noted for the next joint job. Hours protocol as agreed.
Both references come from our project work. Details match the published case pages.
A few bullet points are enough. Name site, time window and type of work via the form. You get a clear reply and — once the basics are in — a concrete offer.
Location (plant / operator) · Time window (shift model / duration) · Type of work (e.g. turnaround/TAR, safety instruction, or both)